How Long Does a Full Villa Renovation Take in Auckland?

How Long Does a Full Villa Renovation Take in Auckland?

How Long Does a Full Villa Renovation Take in Auckland? A full villa renovation in Auckland typically takes 9 to 18 months from first design conversation to handover, depending on the condition of the existing structure, the extent of layout change, and how much...
How Long Does a Full Home Renovation Take in Franklin?

How Long Does a Full Home Renovation Take in Franklin?

A full home renovation in Franklin typically takes 6 to 12 months from the start of design through to handover, depending on scope, consent complexity, and how much structural or services work is involved. Most of that time sits in the pre-construction phase. The...
How Much Does a Home Addition Cost in NZ?

How Much Does a Home Addition Cost in NZ?

A home addition in the Franklin and wider Auckland region typically costs between $3,000 and $5,500 per square metre for a standard ground-floor extension in 2026. Second-storey additions, complex structural work, or high-specification finishes push that range higher....
Home Addition Costs Auckland (2026) | Per Sqm Pricing Guide

Home Addition Costs Auckland (2026) | Per Sqm Pricing Guide

“Should I extend my Franklin home, or am I throwing money away? What do home addition costs actually look like in 2025, and is it worth it compared to moving or rebuilding?” Most Franklin home additions cost $5,500-$7,800 per m² in 2025 (includes GST). A...