How Long Does a Full Villa Renovation Take in Auckland?

How Long Does a Full Villa Renovation Take in Auckland?

How Long Does a Full Villa Renovation Take in Auckland? A full villa renovation in Auckland typically takes 9 to 18 months from first design conversation to handover, depending on the condition of the existing structure, the extent of layout change, and how much...

How Long Does a Full Home Renovation Take in Franklin?

How Long Does a Full Home Renovation Take in Franklin?

A full home renovation in Franklin typically takes 6 to 12 months from the start of design through to handover, depending on scope, consent complexity, and how much structural or services work is involved. Most of that time sits in the pre-construction phase. The...

How Much Does a Home Addition Cost in NZ?

How Much Does a Home Addition Cost in NZ?

A home addition in the Franklin and wider Auckland region typically costs between $3,000 and $5,500 per square metre for a standard ground-floor extension in 2026. Second-storey additions, complex structural work, or high-specification finishes push that range higher....

What Is Included in New Build Costs and What Is Not?

What Is Included in New Build Costs and What Is Not?

When you receive a price to build a new home, the number on the quote rarely tells the full story. New build costs typically cover the physical construction of the house, including the foundation, framing, roofing, cladding, plumbing, electrical work, and interior...

ebook

7 Helpful tips you need to know before starting a successful renovation

Is renovating your home on your ‘to do’ list? We have compiled a free guide with invaluable tips to help you making the right decisions when it comes to renovating.