How We Work With You

How We Guide You From First Call to Finished Home

Your renovation doesn’t have to feel overwhelming or uncertain.
 
We’ve developed a clear, documented process that takes the guesswork out of home renovations. From understanding your vision in that first phone call to walking through your completed project together, we’re with you every step of the way.
 
Our proven 3-stage system ensures you always know what’s happening next, what to expect, and how your investment is being protected.

Stage 1: Envision – It Starts With Your Goals

Step 1: Let’s Talk

We start every project with a straightforward call to understand your goals, budget, and timeline. If needed, we’ll request your council property file upfront, so we’re speaking the same language from the get-go.

 

Step 2: On-Site, In-Person

Next, we visit your place to get the lay of the land—what you want, what you need, and your must-haves versus nice-to-haves. This is where we tailor a design brief to you and your budget.

 

Step 3: Confirm Your Vision

You’ll get your design brief in writing for sign-off. Clarity here avoids headaches down the road.

 

Step 4: Concept & Quote

We’ll present a straightforward quote for your concept plan and preliminary budget proposal—no hidden costs or fluff.

 

Step 5: Signed and Underway

If you’re happy, you sign the quote and pay 50%. Then, our team and designer (if needed) return for a detailed site visit, locking in any specifics necessary to move forward.

 

Step 6: Detailed Design Site Visit

We’ll do a follow-up with our designer and team to refine every aspect, from measurements to any technical requirements, so nothing slips through the cracks.

 

Step 7: Plans In Your Hands

Once the concepts are drawn, we’ll send plans to you for review and sign-off, and set a preliminary budget—so you always know where things stand early.

 

Step 8: Transparent Estimate

Before moving to the next step, we present a full estimate—with specs and standard inclusions—giving you confidence in the pricing, scope, and deliverables.

Stage 2: Design – Nailing Down the Details

Step 1: Design & Consent Contract

Review and sign off on our contract covering design, working drawings, and the full council consent path.

 

Step 2: Working Drawings Underway

Our design team kicks into gear—prepping detailed construction-ready drawings and wrangling any necessary engineering or specialist reports.

 

Step 3: Specifications & Selections

Now’s when you lock in every finish, fixture, kitchen, bathroom, and colour—no last-minute guesswork.

 

Step 4: On-Site Trade Walks

We bring all key contractors on-site to quote from your actual drawings and specs, so numbers are accurate, not estimates.

 

Step 5: Building Consent Submitted

We prep and submit your working drawings and liaise with council for building consent—taking the paperwork off your plate.

 

Step 6: Face-to-Face Quote Review

We’ll sit down together with the completed fixed-price quote and final plans—explaining every detail.

 

Step 7: Contract Signing & Deposit

You sign the Master Build Contract, receive your Guarantee, and pay the deposit. Your spot in our build queue is locked in.

 

Step 8: Pre-Start Project Launch

With consent issued, we pull together your project schedule and onboard you to our project management platform. You’ll meet your project manager, designer, and the key trades before a tool ever hits the site.

Stage 3: Deliver – From First Nail to Aftercare

Step 1: Site Set-Up

We establish the work area, set health & safety procedures, and introduce you to the whole project team.

 

Step 2: Client Meetings

Regular on-site meetings keep you updated, allow for questions, and make it easy to discuss changes as needed.

 

Step 3: Transparency

Daily photos and notes are uploaded to our project management software—so you always know what’s happening with your renovation.

 

Step 4: Client Walk-Through

At practical completion, we walk through together, answer any final questions, and get your sign-off.

 

Step 5: Project Handover

After the council inspection, you’ll receive all documentation, warranties, and your Master Build Guarantee.

 

Step 6: Compliance

We manage all paperwork required by the local council and secure your code of compliance certificate.

 

Step 7: Feedback

We value your experience and would appreciate an honest review to help us keep improving.

 

Step 8: After Move-In Care

Expect check-ins at 3, 6, and 12 months to make sure everything’s performing as it should and you’re fully satisfied.

ebook

7 Helpful tips you need to know before starting a successful renovation

Is renovating your home on your ‘to do’ list? We have compiled a free guide with invaluable tips to help you making the right decisions when it comes to renovating.

GET IN TOUCH WITH THE TEAM TODAY

Our CEO, John, will personally conduct the session, which is normally valued at $300. However, we are offering the session FREE to people that are seriously considering building a dream home to help them make informed decisions towards the next steps.